The results from applying Lean Construction


  • 17.4% less cost ($5 million savings)
  • Completed 19% faster (3 months sooner)
  • Peak Manpower of 270 (Lean) vs 420 (Traditional)
  • ​65% better safety record (vs company average)
  • ​12% higher labor productivity

LEAN CONSTRUCTION CASE STUDY:

Lean versus Traditional Delivery on an Industrial Project


Two identical industrial equipment foundations.  100,000 cubic yards of concrete in each.  Built side by side on the same site, at the same time.  One built using Lean Construction, one built traditionally...